Skip to content
DIVISION ZERO

Construction starts before the jobsite

The connected preconstruction record for commercial GCs. From the set to scopes, packages, bids, and handoff. AI drafts. You approve.

McDonald's
Starbucks
CVS Pharmacy
Chipotle
Delta Sonic
Best Western
TGI Friday's
Rite Aid
GAP
24 Hour Fitness

The problem

Construction starts before anyone breaks ground.

A general contractor may have only two or three weeks to turn a plan set into a complete, competitive proposal.

Two or three weeks

To review the project and submit a complete bid.

Dozens of trades

Each with its own scope, documents, bidders, and risks.

Hundreds of invitations

All requiring delivery, follow-up, responses, and coverage.

The record

The work is connected. The tools should be too.

Plans, scopes, invitations, inboxes, proposal PDFs, and leveling spreadsheets: the work is one process, but the information lives in pieces, and the estimator is left holding everything together.

Plans and specifications

One organized, searchable document set.

Traceable scopes

Every requirement connected to its source.

Bid packages

Consistent packages from approved scopes.

Subcontractor coverage

See who is actually participating.

Verified bids

One source-linked record per proposal.

Bid leveling

Compare assumptions without changing submissions.

How the record moves

One system for the work between receiving the plans and handing off the award.

Each stage builds on the record created before it. Estimators spend less time moving information between disconnected tools and more time reviewing scope, improving coverage, comparing bids, and making decisions.

  1. 01 Understand

    Draft scope · 09 29 00 Gypsum Board

    • 5/8" Type X at corridor ceilingsA5.12 · det 4Accepted
    • Level 4 finish at public areasSpec 09 29 00 §3.5Review
    • Moisture-resistant board at wet wallsConflict · A2.31 note 7 vs specFlagged
    Illustrative. Every line stays tied to a sheet or spec. Not a production screenshot.

    Start with a traceable scope, not a blank page.

  2. 02 Reach

    Package 09-A · Drywall · coverage

    • Meridian DrywallBid received
    • TruLine InteriorsIntends to bid
    • Buckeye CommercialPackage viewed
    • Northpoint PartitionsDeclined
    • Allied LathInvitation sent
    Illustrative. An invitation is not coverage. Participation is tracked separately.

    Consistent packages. Familiar email. Real coverage.

  3. 03 Compare

    BidderSubmittedLeveledNote
    TruLine$1,184,000$1,234,200Permits + bond out
    Meridian$1,232,000$1,232,000Full scope
    Capital$1,229,500$1,238,700Add. 3 open
    Illustrative. Submitted price never changes. You approve every adjustment.

    The submitted proposal stays authoritative. Leveling stays separate.

  4. 04 Award

    Handoff · Package 09-A

    • Final accepted scopeReady
    • Governing proposalAttached
    • Open risks2 assigned
    • Next actionsField
    Illustrative. Construction inherits the record, not a forwarded inbox.

    Preserve more than the winning number.

The operating principle

Division Zero

Division Zero reads, organizes, drafts, compares, and flags.

Estimators

Estimators verify, approve, communicate, and decide.

Consequential actions remain reviewable. Nothing external happens without authorized approval. Division Zero does not autonomously select subcontractors, send unapproved invitations, change submitted proposals, make award decisions, or authorize contracts.

See Division Zero work through a real preconstruction workflow.

Private-pilot access is available to a limited number of commercial general contractors.

FAQ