Skip to content
DIVISION ZERO

How it works

Every step creates a stronger record for the next one.

Division Zero connects the work in four phases. At each one, Division Zero prepares and organizes the information. The estimator reviews it, applies judgment, and decides what moves forward.

Understand

  1. Bring in the plans

    Upload the PDF drawings and specifications. Division Zero indexes the sheets by their existing names and numbers into a familiar digital plan set.

    Division Zero indexes and organizes. You confirm the set.

  2. Review traceable scopes

    Division Zero reads across the documents and drafts a scope for each trade, every item linked to its supporting sheets and notes. Omissions, conflicts, and responsibility gaps are flagged.

    Division Zero drafts, cites, and flags. You verify, edit, and approve.

Draft scope · 09 29 00 Gypsum Board

  • 5/8" Type X at corridor ceilingsA5.12 · det 4Accepted
  • Level 4 finish at public areasSpec 09 29 00 §3.5Review
  • Moisture-resistant board at wet wallsConflict · A2.31 note 7 vs specFlagged
Illustrative. Every line stays tied to a sheet or spec. Not a production screenshot.

Reach

  1. Build the bid packages

    Approved scopes become consistent, versioned packages: overview, due date, documents, bid form, submission instructions. Missing information is requested, not guessed.

    Division Zero assembles. You review and authorize.

  2. Choose whom to invite

    Start with known companies, imported contacts, or the wider databank, narrowed with trade, location, qualification, and relationship evidence.

    Division Zero organizes the evidence. You select and approve the list.

  3. Send and track outreach

    Approved invitations send through your connected email account. Replies route into the package conversation. Views, intent, declines, and questions become coverage signals.

    Division Zero sends, routes, and tracks. You control message and follow-up.

  4. Keep bidders current

    Approved addenda and revisions update the active package. Division Zero records which version each recipient received.

    Division Zero maintains and notifies. You approve changes and rules.

Package 09-A · Drywall · coverage

  • Meridian DrywallBid received
  • TruLine InteriorsIntends to bid
  • Buckeye CommercialPackage viewed
  • Northpoint PartitionsDeclined
  • Allied LathInvitation sent
Illustrative. An invitation is not coverage. Participation is tracked separately.

Compare

  1. Collect verified bids

    Structured form, uploaded proposal, or an initial email reply: each becomes one bid record with the original preserved and missing or conflicting information flagged.

    Division Zero structures and flags. The subcontractor certifies. You verify.

  2. Level on a common basis

    Each verified bid is compared against the approved package scope. Submitted prices remain unchanged. Separate adjustments normalize scope and commercial differences.

    Division Zero aligns and suggests. You investigate, adjust, and approve.

BidderSubmittedLeveledNote
TruLine$1,184,000$1,234,200Permits + bond out
Meridian$1,232,000$1,232,000Full scope
Capital$1,229,500$1,238,700Add. 3 open
Illustrative. Submitted price never changes. You approve every adjustment.

Award

  1. Approve the award

    Recommend a bidder, mark the selection conditional, preserve backups, and route the decision through your approval process. No external award is sent merely because a bidder was selected internally.

    Division Zero assembles the decision record. Authorized users approve and communicate.

  2. Hand off the record

    Construction receives the governing proposal, final scope, commercial basis, clarifications, commitments, open risks, contacts, and next actions, each traceable to the source that created it.

    Division Zero preserves and organizes. The project team carries the work forward.

Handoff · Package 09-A

  • Final accepted scopeReady
  • Governing proposalAttached
  • Open risks2 assigned
  • Next actionsField
Illustrative. Construction inherits the record, not a forwarded inbox.

No invitation is sent without estimator approval, and an invitation is not counted as coverage. Participation is tracked separately. Internal selection, intent to award, formal award, and contract execution remain distinct stages.

See Division Zero work through a real preconstruction workflow.

Private-pilot access is available to a limited number of commercial general contractors.